Monday, October 22, 2012

10222012

Worked more on the bus, still putting up walls. Put in the floor for the refrigerator, started insulating the walls of the refrigerator enclosure. Also put aluminum tape around the bus heater enclosure.






10212012

Took off today to work on the bus. The plan is to get it ready for a trip to Tennessee, for Christmas.

My main objective now is to get it livable and able to travel. It's at the point where I can start closing up walls and securing cabinets to floors. Water, plumbing, and electrical is secondary, but still important. I just want to be sure it is livable and able to make the trip there and back. and



Tuesday, October 16, 2012

Update 10162012

Few more pics of black/gray tanks. Will have to take them back down. I want to paint the inside of the wood with some waterproofing paint, and add some more support. Will then plumb and then water test them.




Monday, October 15, 2012

Update 10152012

Worked on bus heater vent. Built support for fridge, and under fridge drawer. Worked on hanging black and Gray water tanks. Pain in the booty.






Wednesday, October 10, 2012

I know, I know its been awhile.

Let me just say, what has been taking so long to post (besides life) is the electrical. I don't want to do all this work to have it burn up or to hurt or kill someone. So that being said, here is whats going on.

Plumbing. The biggest pain in the butt, has to be, how to vent all drains.