Tuesday, April 12, 2011

041311 Bus Work

I framed out my shower (no pics) then started building my cabinets for the kitchen area. This is the first one I have ever tried.

One side is oak plywood (right) it will be sanded and stained because part of it will be seen next to the bench. the other is rough plywood. it will be next to the stove so I am not concerned about it looking nice. I may try to cover it with stainless steel as it will be easier to clean and protect the wood from heat.


It's hard to see but I measured and drew the drawers and doors and then cut them out with a drimmel tool. broke 5 bits in the process. Pain in the butt. Need to find a better way.

 
Test fit.


Got done and it was dark. Ill be attaching the face on the cabinet tomorrow, as well as build the other one.
Once I am done with the cabinets that will be a mile stone. I will be done framing the inside of the bus.Next it will be plumbing and electrical. I can't wait until I can take my first trip. This is one year that I have started working on the bus.
See ya next time.

No comments:

Post a Comment