I finished the sub floor. That is I finished laying in the plywood. I still want to seal the plywood with paint or Thompson's water seal. I will also silicone the joints and foam the areas on the sides.
My next big thing will be to skin seven windows on each side. I am trying to find a place to get inexpensive sheet metal. After that I will be able to start framing walls.
I had not painted this area like I had the rear, so I painted it before I put the plywood down. I did not put insulation under the plywood here because the area would have been higher than the area under the driver and I want any water that may be tracked in to go towards the door.
The area along the edge I will foam insulate.
Till next time....
No comments:
Post a Comment